1) Special ORDER Brunei N52 ENGINE for 323i Euro All Parts
BMWLOCATION:DD Patio Box 20
Long block with intake.
N52 2.5l engine for e90
Crated wrapped placed on a skid
Price includes delivery to Brunei
Scroll down for more details or e-mail your questions to: info@euroallparts.com
1) Special Order Brunei N52 engine for 323i Euro All Parts
This is the engine we are shipping:
Please verify with your mechanic that it is exactly what you need.
The N52 features Valvetronic (variable valve lift),[7] a lighter block due to the use of a magnesium alloy[8] and an electric water pump (replacing the belt-driven water pump)[9][10] and a variable output oil pump.[11] The redline was increased from 6,500 rpm to 7,000 rpm, except for N52B25 (130 kW).[12]
the N52 uses electronic throttle control and variable valve timing (double-VANOS). Higher output versions of the N52 use a three-stage variable length intake manifold (also called "DISA").[13][14]
The N52 engine block is made from a combination of magnesium and aluminium.[12] Magnesium is lighter than aluminium, however it has a greater risk of corrosion from water and may creep under load at high temperatures; this makes traditional magnesium alloys not suited for withstanding the high loads to which an engine block is exposed. Therefore, BMW used a magnesium alloy for the crankcase shell, with an aluminum 'inner block' to overcome the limitations of magnesium alloys.[11][15] The cylinder liners are made of Alusil[16] and a hollow camshaft is used to reduce weight.[11]
The engine control unit (also called "DME") is a Siemens MSV70.
150 kW (201 bhp) Applications:
2007-2011 E90 323i — Canada and Australia
N52B25 2,497 cc (152.4 cu in)
150 kW (201 bhp)at 6,400 rpm
250 N⋅m (184 lb⋅ft)at 2,750 rpm 2007-2011
SHIPPING:
WDG-307460/1
Destination: Muara, Brunei Darussalam
Destination Agent: Harbour Link Shipping Sdn Bhd (Jalan Gadong)
Lot No: 11620, Unit 4, Ground Floor, Block A, Scouts Headquarters, Jalan Gadong, Bandar Seri Begawan
Muara
Brunei Darussalam
Tel: 001-673-2-456618/456619/456620
CFS Closing CERS Cutoff Vessel Sailing ETS Via ETA T/S ETA Dest
Mar-15-2023 Mar-15 YM Triumph v.013W VANCOUVER Apr-05 SINGAPORE Apr-28 May-04-2023 Transit Days: 29
- If you have question regarding: fitment, availability, condition, delivery or any other question about this or any other part, please e-mail us: " info@euroallparts.com "